Home › Operated plant hire › Dumper with operator

Dumper hire with driver

A dumper and its driver move spoil away from the dig and bring stone, sand and blocks back to it. Hired alongside a digger, it means the digger is not left waiting while spoil is barrowed away.

A site dumper and its driver crossing a new-build housing site

Jobs a dumper and driver do

Most dumper hires run alongside one of our diggers. A dumper also works on its own where your team is digging by hand or with your own machine.

Spoil to the skip

Each bucketful from the dig carried to the skip, the grab lorry or a stockpile.

Long garden runs

Spoil moved from the back of a garden to a skip on the drive, along a path or passage.

Stone and sand to the work

Sub-base, sand and gravel brought from the delivery point to where it is laid.

Blocks and materials

Pallets broken down and blocks or kerbs carried to the bricklayers.

Backfilling

Stone or spoil tipped back into trenches once pipes are laid and inspected.

Site tidying

Rubble and offcuts collected around the site and taken to the skip.

Dumper sizes

Tracked dumpers go where wheels would sink or would not fit. Site dumpers carry more on open, firm ground.

MachineWidthTipSuits
Tracked dumper, 0.5 tonne700 mmFront tipSide passages and narrow garden paths
Tracked dumper, 1 tonne850 mmHigh tipTipping straight into a skip
Site dumper, 3 tonne1.6 mSwivel tipOpen sites, stockpiles and backfilling

Sizes are for planning. A high-tip dumper lifts its skip to empty into a builder's skip without a ramp.

Working with the digger

When we supply both machines, the two operators work as one crew.

  1. The route
    We agree the run

    The path from the dig to the skip or stockpile, and anything on the way that needs boarding or protecting.

  2. Loading
    The digger loads the dumper

    Spoil goes straight into the dumper, so it is not handled twice.

  3. Tipping
    The dumper empties at the skip

    A high-tip dumper empties over the side of the skip. Others tip onto a heap for the digger to load.

  4. Return
    Materials back to the work

    On the way back the driver brings stone or sand, so the run is not wasted.

What we need to know about the route

For a dumper, the route matters more than the dig.

  • The narrowest pointThe tightest gap between the dig and the skip.
  • DistanceRoughly how far the dumper travels each way.
  • Slopes and stepsRamps, steps or kerbs on the route, with photos if possible.
  • SurfacesLawn, block paving or anything that needs protecting.

Dumper questions

Do I need a dumper as well as a digger?

If the skip is more than a few metres from the dig, usually yes. Without one, the digger stops while spoil is barrowed away.

Can a tracked dumper climb steps?

Steps need ramps or a different route. Send photos of any steps and we will say what is possible.

Can I hire a dumper on its own?

Yes, with its driver, for jobs where your team is digging.

Also hired with an operator

Dumpers and drivers work on jobs in Swansea, Llanelli, Ammanford and Gower.

Request a dumper quote

Tell us the route from the dig to the skip, and whether you need a digger too.

Dumper with operator

We use these details to reply to your enquiry. Privacy notice

Dumper with operatorRequest a quote